Final | 1/27/2005 | 1/28/2005 | 1/28/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 6:04:02 PM. Contact: ###-####.
|
DOC - Permit Finaled | 1/28/2005 | 1/28/2005 | 1/28/2005 | A | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 1/28/2005 10:22:25 AM
|
Rough-in | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 5:09:29 PM. Contact: ###-####.
|
Pressure Test | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 5:09:39 PM. Contact: ###-####.
25 psi 1/4/2005 11:19:16 AM
|
Application received | | | 12/27/2004 | | |
|
|
|
|
Issue permit | | | 12/27/2004 | | DONE |
|
|
|
|