Final | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 4:46:00 PM.
|
DOC - Permit Finaled | 2/16/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Jim Sly
|
|
|
Finaled by inspector at 2/16/2005 9:32:23 AM
|
Final | 2/8/2005 | 2/9/2005 | 2/9/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/8/2005 at 5:17:24 PM. Contact: ###-####. no access...door locked..called lindsay 2/9/2005 9:45:18 AM
|
Rough-in | 1/12/2005 | 1/13/2005 | 1/13/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 2:06:18 PM. Contact: ###-####.
|
Pressure Test | 1/12/2005 | 1/13/2005 | 1/13/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 2:06:32 PM. Contact: ###-####.
|
Application received | | | 1/7/2005 | | |
|
|
|
|
Issue permit | | | 1/7/2005 | | DONE |
|
|
|
|