Final | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 4:04:13 PM. Contact: ###-####.
|
DOC - Permit Finaled | 2/10/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Jim Sly
|
|
|
Finaled by inspector at 2/10/2005 10:28:20 AM
|
Rough-in | 1/14/2005 | 1/18/2005 | 1/18/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 4:54:22 PM. Contact: ###-####.
|
Pressure Test | 1/14/2005 | 1/18/2005 | 1/18/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 4:54:31 PM. Contact: ###-####.
|
Application received | | | 1/11/2005 | | |
|
|
|
|
Issue permit | | | 1/11/2005 | | DONE |
|
|
|
|