Third Notice MEC | 4/21/2005 | 4/21/2005 | 5/3/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice MEC | 4/11/2005 | 4/11/2005 | 4/21/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 4/1/2005 | 4/11/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | PASS |
Alan Hauser
|
|
|
Finaled by inspector at 4/1/2005 5:11:45 PM
|
Final | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | PASS |
Alan Hauser
|
|
|
did 60# test 4/1/2005 5:11:44 PM
|
Final | 3/29/2005 | 3/29/2005 | 3/29/2005 | P | FAIL |
Alan Hauser
|
|
|
need full 3/4" i.d. flex at make up air unit on roof 3/29/2005 4:25:28 PM
|
Pressure Test | 2/22/2005 | 2/23/2005 | 2/23/2005 | A | PASS |
Dixie Fellows
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Jan Rice line size increased..20lb test ok 2/23/2005 9:36:38 AM
|
Pressure Test | 2/8/2005 | 2/8/2005 | 2/8/2005 | P | PASS |
Dixie Fellows
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Jan Rice...AS LATE AS POSSIBLE 2/8/2005 9:39:41 AM 20LB TEST FOR MAIN LINE INTO BLDG TO W/H AND WOK OK 2/8/2005 4:29:07 PM
|
Pressure Test | 1/18/2005 | 1/19/2005 | 1/19/2005 | A | PASS |
Dixie Fellows
|
|
|
###-#### u/g gas test 1/18/2005 8:08:42 PM 6' of gas u/g at 60lb test ok 1/19/2005 8:27:08 AM
|
Rough-in | 1/18/2005 | 1/18/2005 | 1/18/2005 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jan Rice OUT OF TIME..RESCHEDULED AND CALLED CONT 1/18/2005 8:04:10 PM
|
Application received | | | 1/18/2005 | | |
|
|
|
|
Issue permit | | | 1/18/2005 | | DONE |
|
|
|
|