Telephone call | | | 12/22/2005 | | DONE |
|
|
|
Spoke with April from A-1 and she billed & was paid a total of $6,440///12/22/05 BAS
|
Second Notice MEC | 4/11/2005 | 4/11/2005 | 4/14/2005 | | DONE |
|
|
|
This permit finaled on the web by APRIL THOMAS
|
First Notice Sent | | 3/23/2005 | 4/11/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 3/23/2005 | 3/23/2005 | 3/23/2005 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 3/23/2005 11:39:05 AM
|
Final | 3/22/2005 | 3/23/2005 | 3/23/2005 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Pressure Test | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | CANC |
Dixie Fellows
|
|
|
key is over the door, test is on the outside.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Pressure Test | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | PASS |
Dixie Fellows
|
|
|
BUILDING WILL BE UNLOCKED ; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS 60lb ok 2/2/2005 2:22:36 PM
|
Application received | | | 1/26/2005 | | |
|
|
|
This permit was created on the web by APRIL THOMAS
|