Conference | 2/21/2006 | 2/22/2006 | 2/22/2006 | A | PEND |
Dixie Fellows
|
|
|
met builder to discuss termination on w/h
|
Conference | 2/21/2006 | 2/21/2006 | 2/21/2006 | P | PEND |
Dixie Fellows
|
|
|
per dixie send for today in the pm
|
CHANGE STATUS TO (ISS) | | | 2/21/2006 | | DONE |
|
|
|
per dixie change status & set up for conf
|
Final | 10/5/2005 | 10/5/2005 | 10/5/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/5/2005 at 11:12:49 AM. Contact: ###-####.
|
Final | 9/22/2005 | 9/23/2005 | 9/23/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 1:35:55 PM. Contact: ###-####....need 36" clearance from range to overhead combustible
|
Final | 9/20/2005 | 9/21/2005 | 9/22/2005 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/20/2005 at 3:25:23 PM. Contact: ###-####.
|
Rough-in | 3/24/2005 | 3/25/2005 | 3/25/2005 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/24/2005 at 3:51:11 PM. Contact: ###-####.
|
Rough-in | 3/22/2005 | 3/23/2005 | 3/23/2005 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/22/2005 at 3:39:00 PM. Contact: ###-####. all supply and return duct to be class 1 or class 0 listed duct, remove all air connector and replace with one of the above 3/23/2005 2:53:04 PM
|
Application received | | | 3/22/2005 | | |
|
|
|
|
Issue permit | | | 3/22/2005 | | DONE |
|
|
|
|