Second Notice MEC | 1/31/2006 | 1/31/2006 | 2/7/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 1/18/2006 | 1/18/2006 | 1/31/2006 | | DONE |
Dixie Fellows
|
|
|
|
Final | 1/18/2006 | 1/18/2006 | 1/18/2006 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
MEC-Aging Inspection | 1/18/2006 | 1/18/2006 | 1/18/2006 | | PASS |
Dixie Fellows
|
|
|
|
Final | 11/11/2005 | 11/14/2005 | 11/14/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/11/2005 at 9:35:14 AM. Contact: ###-####...need drain pan for grease and hinge kit
|
Rough-in | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/25/2005 at 9:14:27 AM. Contact: ###-####...ok to cover ceiling in kitchen..discussed air balance and list of equipment owner and tml supplied. i will need these before any finals
|
Conference | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/21/2005 at 4:58:17 PM. Contact: ###-####...discussed r/a in kitchen..told rob it had to be ducted..r/a in dining area doesn't have to be ducted as the whole area is the plenum
|
Rough-in | 9/8/2005 | 9/8/2005 | 9/8/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/8/2005 at 9:05:59 AM. Contact: ###-####...ok to cover waitress station on 2nd floor
|
Rough-in | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | NR |
Dixie Fellows
|
|
|
rob not at job when i got there..miscommunication on time..rescheduled for thurs am..i'm out of office this pm
|
Rough-in | 9/2/2005 | 9/6/2005 | 9/6/2005 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/2/2005 at 3:31:50 PM. Contact: ###-####...RESCHEDULED FOR WED AM
|
Rough-in | 8/22/2005 | 8/22/2005 | 8/22/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 10:25:17 AM. Contact: ###-####...ok to cover hard lid bathroom on main floor
|
Conference | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | FAIL |
Troy James
|
|
|
rob butler; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need clarification on calculation from engineer on the make-up at hoods, c/n posted with job super.
|
Rough-in | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 2:36:49 PM. Contact: ###-####...ok to cover bath lids..exhaust terminates through the wall into kitchen..will check on next inspection
|
Application received | | | 5/19/2005 | | |
|
|
|
|
Issue permit | | | 5/19/2005 | | DONE |
|
|
|
|