Final | 11/15/2006 | 11/15/2006 | 11/15/2006 | A | PASS |
Troy James
|
|
|
|
Pressure Test | 4/6/2006 | 4/7/2006 | 4/7/2006 | P | PASS |
Dixie Fellows
|
|
|
Master in-floor heat; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht
|
Pressure Test | 3/7/2006 | 3/8/2006 | 3/8/2006 | A | NR |
Dixie Fellows
|
|
|
Supply & return- approval for cover; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht
|
Pressure Test | 10/13/2005 | 10/14/2005 | 10/14/2005 | A | PASS |
Dixie Fellows
|
|
|
This is for the in-floor tubing on the 2nd floor; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht...100 lb test ok
|
Pressure Test | 6/3/2005 | 6/3/2005 | 6/3/2005 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht....100LB TEST ON HYDRONIC OK
|
Application received | | | 6/3/2005 | | DONE |
|
|
|
This permit was created on the web by Shelly Albrecht
|