Final | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/13/2006 at 11:12:26 PM. Contact: ###-####.
|
Rough-in | 12/9/2005 | 12/9/2005 | 12/9/2005 | A | PASS |
Lee Rice
|
|
|
will call back for mantle inspection on final
|
Final | 12/8/2005 | 12/9/2005 | 12/9/2005 | A | CANC |
Lee Rice
|
|
|
shauna (Homeowner)will be there in the am, please call first; Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/8/2005 | | DONE |
|
|
|
re-open per Lee Rice need final inspection on fireplace
|
Pressure Test | 6/8/2005 | 6/9/2005 | 6/9/2005 | A | PASS |
Dixie Fellows
|
|
|
bj ###-####...duct work ok...gas test to future f/p ok
|
Final | 6/8/2005 | 6/9/2005 | 6/9/2005 | A | PASS |
Dixie Fellows
|
|
|
bj ###-####
|
Application received | | | 6/8/2005 | | |
|
|
|
|
Issue permit | | | 6/8/2005 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/8/2005 | | DONE |
|
|
|
|