Final | 10/27/2005 | 10/28/2005 | 10/28/2005 | A | PASS |
Bill VanDegrift
|
|
|
late am please//dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Final | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | FAIL |
Dixie Fellows
|
|
|
job wasn't ready and there were several correction notices
|
Final | 10/26/2005 | 10/26/2005 | 10/26/2005 | P | DEFR |
Bill VanDegrift
|
|
|
late pm as possible///dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa out of time
|
Rough-in | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Dixie Fellows
|
|
|
jr; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | PASS |
Dixie Fellows
|
|
|
J.R.; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Rough-in | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | FAIL |
Dixie Fellows
|
|
|
J.R.; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa...need comb air to upstairs furnace
|
Application received | | | 6/28/2005 | | |
|
|
|
|
Issue permit | | | 6/28/2005 | | DONE |
|
|
|
|