Final | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | PASS |
Troy James
|
|
|
april -- ###-#### -re-insp
|
Stop Work/Reinspection Fee | 1/30/2006 | 1/30/2006 | 2/1/2006 | P | DONE |
Lee Rice
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS;;;;;third trip for final inspection and we still have to come back to reinspect for combustion air that was not provided since last inspection and notification. correction posted on door to furnace and water heater room where combustion air needs to be provided.
|
Final | 1/27/2006 | 1/30/2006 | 1/30/2006 | A | FAIL |
Lee Rice
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS see stop work reinspection
|
Final | 1/26/2006 | 1/27/2006 | 1/27/2006 | A | PART |
Alan Hauser
|
|
|
all ok except waiting for doors to be put on garage equipment room, then will be able to determine combustion air requirements
|
Final | 1/26/2006 | 1/26/2006 | 1/26/2006 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS unable to locate secondary drain to furnace at third level, please verify location
|
Pressure Test | 9/14/2005 | 9/15/2005 | 9/15/2005 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### gas test ok
|
Rough-in | 9/14/2005 | 9/15/2005 | 9/15/2005 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-####
|
Application received | | | 8/5/2005 | | DONE |
|
|
|
This permit was created on the web by APRIL THOMAS
|