Final | 10/2/2006 | 10/2/2006 | 10/2/2006 | P | PASS |
Dixie Fellows
|
|
|
Internet Inspection Request from: Shelley Baisch
|
Final | 9/28/2006 | 9/29/2006 | 9/29/2006 | P | FAIL |
Bill VanDegrift
|
|
|
shelley ###-#### 1st floor den fireplace flue is incomplete.
|
Conference | 9/28/2006 | 9/29/2006 | 9/29/2006 | P | DONE |
Dixie Fellows
|
|
|
shelley ###-####..THIS IS A FINAL
|
Final | 9/28/2006 | 9/28/2006 | 9/28/2006 | P | PEND |
Dixie Fellows
|
|
|
From Dixie Mae..hi shelley, the builder called all the mech cont (4) to schedule for the same time..i rescheduled this for the same time as they all will fri pm..thanks dixie
|
Final | 9/27/2006 | 9/27/2006 | 9/27/2006 | A | PEND |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/27/2006 at 5:05:44 AM. Contact: ###-####...hi shelley, i will schedule and final this when artic air schedules theirs..thanks dixie
|
Rough-in | 9/26/2005 | 9/26/2005 | 9/26/2005 | A | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/26/2005 at 3:41:31 AM. Contact: ###-####. not ready called contractor, maybe wrong permit number.
|
Rough-in | 9/6/2005 | 9/7/2005 | 9/7/2005 | A | NR |
Dixie Fellows
|
|
|
no other f/p installed at this time???
|
Rough-in | 9/6/2005 | 9/6/2005 | 9/6/2005 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/6/2005 at 10:38:18 AM. Contact: ###-####...RESCHEDULED FOR WED AM
|
Rough-in | 8/31/2005 | 8/31/2005 | 8/31/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 8:12:28 AM. Contact: ###-####....F/P OUTSIDE ON PATIO OK..OTHERS NOT INSTALLED YET
|
Application received | | | 8/25/2005 | | |
|
|
|
|
Issue permit | | | 8/25/2005 | | DONE |
|
|
|
|