Final | 1/18/2006 | 1/19/2006 | 1/19/2006 | P | PASS |
Alan Hauser
|
|
|
duane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Rough-in | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | PASS |
Alan Hauser
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Pressure Test | 9/27/2005 | 9/27/2005 | 9/27/2005 | P | FAIL |
Alan Hauser
|
|
|
###-#### - mike
|
Rough-in | 9/27/2005 | 9/27/2005 | 9/27/2005 | P | FAIL |
Alan Hauser
|
|
|
###-#### - mike
|
Pressure Test | 9/26/2005 | 9/26/2005 | 9/26/2005 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### - les gas test failed.
|
Rough-in | 9/26/2005 | 9/26/2005 | 9/26/2005 | P | FAIL |
Bill VanDegrift
|
|
|
insulation shield required at b-vent, vapor berrier required at duct fittings in unconditioned space, hang gas piping by 1/2" offset
|
Application received | | | 9/21/2005 | | |
|
|
|
|
Issue permit | | | 9/21/2005 | | DONE |
|
|
|
|