(F) Reprint permit | | | 5/22/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/22/2008 | | DONE |
|
|
|
|
Third Notice MEC | 1/7/2008 | 1/7/2008 | 4/22/2008 | | DONE |
Tisha Gallop
|
|
|
This permit finaled on the web by Allison Briggs
|
Second Notice MEC | 12/7/2007 | 12/7/2007 | 1/7/2008 | | DONE |
Tisha Gallop
|
|
|
First Notice has not been responded to.
|
First Notice | 10/24/2007 | 10/24/2007 | 12/7/2007 | | DONE |
Alan Hauser
|
|
|
|
Final | 10/23/2007 | 10/24/2007 | 10/24/2007 | A | PASS |
Alan Hauser
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/23/2007 | | DONE |
|
|
|
needs final on south tower
|
Second Notice MEC | 8/7/2007 | 8/7/2007 | 9/13/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/19/2007 | 7/19/2007 | 8/7/2007 | | DONE |
Alan Hauser
|
|
|
|
Final | 7/18/2007 | 7/18/2007 | 7/19/2007 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Alan Hauser
|
|
|
last inspection, all piping inspected
|
MEC-Aging Inspection | 6/18/2007 | 6/18/2007 | 6/18/2007 | | CANC |
Alan Hauser
|
|
|
|
Pressure Test | 4/18/2007 | 4/18/2007 | 4/18/2007 | P | PART |
Alan Hauser
|
|
|
2nd floor entire loop ok
|
Rough-in | 3/30/2007 | 3/30/2007 | 3/30/2007 | P | PART |
Alan Hauser
|
|
|
cws, cwr, and hws, hwr ok for penthouse and shaft
|
Rough-in | 3/8/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Alan Hauser
|
|
|
forgot to add time to other inspections
|
Rough-in | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Alan Hauser
|
|
|
8th floor tests ok for loops
|
Rough-in | 3/7/2007 | 3/7/2007 | 3/8/2007 | P | PART |
Alan Hauser
|
|
|
8th floor test ok for loops
|
MEC-Aging Inspection | 2/21/2007 | 2/21/2007 | 2/21/2007 | | CANC |
Alan Hauser
|
|
|
|
Rough-in | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PART |
Alan Hauser
|
|
|
5th floor heating loop ok
|
Final | 11/14/2006 | 11/16/2006 | 11/16/2006 | A | PART |
Alan Hauser
|
|
|
final for pharmacy and looked at piping on 6th floor, two uh and cwr and cws
|
Rough-in | 10/30/2006 | 10/31/2006 | 10/31/2006 | A | PART |
Alan Hauser
|
|
|
hydronics all 4th floor
|
Rough-in | 10/5/2006 | 10/6/2006 | 10/6/2006 | P | PART |
Alan Hauser
|
|
|
heating supply and return loop from basement to 10th floor
|
Pressure Test | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | PART |
Jim Johnson
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 60 # gas test for third floor fire place test ok
|
Pressure Test | 9/26/2006 | 9/27/2006 | 9/27/2006 | P | PEND |
Dixie Fellows
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..i spoke wiith dave and ask him to reschedule this for thurs am, as alan is not in today. i also told him if this became a big problem to call me and i would come out and do it..thanks alot dixie
|
Rough-in | 9/15/2006 | 9/18/2006 | 9/18/2006 | A | PART |
Alan Hauser
|
|
|
walked 2nd floor with david, piping ok
|
Rough-in | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PART |
Alan Hauser
|
|
|
david Note: heating supply & return; piping ok for rest of 1st floor, and all of 3rd floor except little in old building
|
MEC-Aging Inspection | 7/18/2006 | 7/18/2006 | 7/18/2006 | | CANC |
Alan Hauser
|
|
|
|
Rough-in | 5/17/2006 | 5/18/2006 | 5/18/2006 | A | PART |
Alan Hauser
|
|
|
low and med. steam to 2nd floor surgery
|
Rough-in | 5/16/2006 | 5/16/2006 | 5/16/2006 | P | PART |
Alan Hauser
|
|
|
hps piping in basement
|
Rough-in | 5/10/2006 | 5/11/2006 | 5/11/2006 | P | PART |
Lee Rice
|
|
|
gary Note: consedate ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pumped condensate in basement and surgery basement 1st and snd floor low pressure steam cond returns. tests ok.
|
Conference | 5/2/2006 | 5/3/2006 | 5/3/2006 | A | PART |
Alan Hauser
|
|
|
|
Rough-in | 5/2/2006 | 5/2/2006 | 5/3/2006 | P | PART |
Alan Hauser
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Rough-in | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PART |
Alan Hauser
|
|
|
hot water heating side basement ok
|
Rough-in | 4/6/2006 | 4/6/2006 | 4/6/2006 | P | PART |
Alan Hauser
|
|
|
Jerry -- cooling water cover; ok, for basement area 100
|
MEC-Aging Inspection | 3/13/2006 | 3/13/2006 | 3/13/2006 | | CANC |
Troy James
|
|
|
wip
|
Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 | A | PART |
Troy James
|
|
|
jerry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie looked at mpc line at first level
|
Rough-in | 12/21/2005 | 12/21/2005 | 12/21/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/21/2005 at 9:56:46 AM. Contact: ###-####. inspected hydronics first level
|
Application received | | | 12/20/2005 | | DONE |
|
|
|
This permit was created on the web by Karla Baker
|
Telephone call | | | | | |
|
|
|
Received phone call from Allison from RM Mech. still working on value, there will be change orders. Will skip November and send another third notice in December.
|