Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberMEC05-04183
StatusFinaled
Name RM MECHANICAL
Site Address 1055 N CURTIS RD
Project Name 
Customer Number05-103
ePlanReview 
Description
Mechanical Permit - New: NATURAL GAS, TEMP. HEAT, HOT WATER SUPPLY & RETURN, CHILLED WATER SUPPLY & RETURN, LOW PRESSURE STEAM, MED. PRESSURE STEAM, HIGH PRESSURE STEAM, STEAM COND. RETURN, HVAC COND. DRAIN, HVAC DEMO, HVAC EQUIPMENT, CORE DRILLED/LINK SEAL HOLES, GENERATOR GLYCO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  5/22/2008 DONE
(F) Reprint permit  5/22/2008 DONE
Third Notice MEC1/7/20081/7/20084/22/2008 DONE
DetailsTisha Gallop
This permit finaled on the web by Allison Briggs
Second Notice MEC12/7/200712/7/20071/7/2008 DONE
DetailsTisha Gallop
First Notice has not been responded to.
First Notice10/24/200710/24/200712/7/2007 DONE
DetailsAlan Hauser
Final10/23/200710/24/200710/24/2007APASS
DetailsAlan Hauser
CHANGE STATUS TO (ISS)  10/23/2007 DONE
needs final on south tower
Second Notice MEC8/7/20078/7/20079/13/2007 DONE
First Notice has not been responded to.
First Notice7/19/20077/19/20078/7/2007 DONE
DetailsAlan Hauser
Final7/18/20077/18/20077/19/2007PPASS
DetailsAlan Hauser
Rough-in7/17/20077/17/20077/17/2007PPASS
DetailsAlan Hauser
last inspection, all piping inspected
MEC-Aging Inspection6/18/20076/18/20076/18/2007 CANC
DetailsAlan Hauser
Pressure Test4/18/20074/18/20074/18/2007PPART
DetailsAlan Hauser
2nd floor entire loop ok
Rough-in3/30/20073/30/20073/30/2007PPART
DetailsAlan Hauser
cws, cwr, and hws, hwr ok for penthouse and shaft
Rough-in3/8/20073/8/20073/8/2007APART
DetailsAlan Hauser
forgot to add time to other inspections
Rough-in3/7/20073/8/20073/8/2007APART
DetailsAlan Hauser
8th floor tests ok for loops
Rough-in3/7/20073/7/20073/8/2007PPART
DetailsAlan Hauser
8th floor test ok for loops
MEC-Aging Inspection2/21/20072/21/20072/21/2007 CANC
DetailsAlan Hauser
Rough-in12/4/200612/5/200612/5/2006APART
DetailsAlan Hauser
5th floor heating loop ok
Final11/14/200611/16/200611/16/2006APART
DetailsAlan Hauser
final for pharmacy and looked at piping on 6th floor, two uh and cwr and cws
Rough-in10/30/200610/31/200610/31/2006APART
DetailsAlan Hauser
hydronics all 4th floor
Rough-in10/5/200610/6/200610/6/2006PPART
DetailsAlan Hauser
heating supply and return loop from basement to 10th floor
Pressure Test9/28/20069/29/20069/29/2006APART
DetailsJim Johnson
david; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 60 # gas test for third floor fire place test ok
Pressure Test9/26/20069/27/20069/27/2006PPEND
DetailsDixie Fellows
david; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..i spoke wiith dave and ask him to reschedule this for thurs am, as alan is not in today. i also told him if this became a big problem to call me and i would come out and do it..thanks alot dixie
Rough-in9/15/20069/18/20069/18/2006APART
DetailsAlan Hauser
walked 2nd floor with david, piping ok
Rough-in9/12/20069/13/20069/13/2006APART
DetailsAlan Hauser
david Note: heating supply & return; piping ok for rest of 1st floor, and all of 3rd floor except little in old building
MEC-Aging Inspection7/18/20067/18/20067/18/2006 CANC
DetailsAlan Hauser
Rough-in5/17/20065/18/20065/18/2006APART
DetailsAlan Hauser
low and med. steam to 2nd floor surgery






















Rough-in5/16/20065/16/20065/16/2006PPART
DetailsAlan Hauser
hps piping in basement
Rough-in5/10/20065/11/20065/11/2006PPART
DetailsLee Rice
gary Note: consedate ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pumped condensate in basement and surgery basement 1st and snd floor low pressure steam cond returns. tests ok.
Conference5/2/20065/3/20065/3/2006APART
DetailsAlan Hauser
Rough-in5/2/20065/2/20065/3/2006PPART
DetailsAlan Hauser
Gary; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
Rough-in4/13/20064/13/20064/13/2006PPART
DetailsAlan Hauser
hot water heating side basement ok
Rough-in4/6/20064/6/20064/6/2006PPART
DetailsAlan Hauser
Jerry -- cooling water cover; ok, for basement area 100
MEC-Aging Inspection3/13/20063/13/20063/13/2006 CANC
DetailsTroy James
wip
Rough-in1/10/20061/11/20061/11/2006APART
DetailsTroy James
jerry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
looked at mpc line at first level
Rough-in12/21/200512/21/200512/21/2005PPART
DetailsTroy James
Scheduled by a contractor via Hello! on 12/21/2005 at 9:56:46 AM. Contact: ###-####. inspected hydronics first level
Application received  12/20/2005 DONE
This permit was created on the web by Karla Baker
Telephone call     
Received phone call from Allison from RM Mech. still working on value, there will be change orders. Will skip November and send another third notice in December.