Final | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | DONE |
Dixie Fellows
|
|
|
|
Final | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | PASS |
Dixie Fellows
|
|
|
|
Pressure Test | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | PASS |
Dixie Fellows
|
|
|
ima ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Pressure Test | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/2/2006 at 7:38:08 AM. Contact: ###-####...need stamped and signed letter from engineer of w/h, for approval of flue not having a minimum 3' of horizontal run.
|
Pressure Test | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | FAIL |
Dixie Fellows
|
|
|
Ina; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt..flue not installed per manuf..gas test holding and size ok
|
Application received | | | 5/31/2006 | | |
|
|
|
|
Issue permit | | | 5/31/2006 | | DONE |
|
|
|
|