(F) Reprint permit | | | 3/18/2009 | | DONE |
|
|
|
|
Case Summary (MEC) | | | 12/2/2008 | | DONE |
|
|
|
|
Final | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS..door removed from mech room.
|
Final | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/29/2006 at 8:00:25 AM. Contact: ###-####...combustion air issue not taken care of $$$$$$$$$$$$$$$$$$$..dixie
|
Final | 7/7/2006 | 7/10/2006 | 7/10/2006 | A | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS..oops..need comb air, insulate pvc flue in crawl with 1 1/2" armaflex by final..thanks
|
Rough-in | 7/10/2006 | 7/10/2006 | 7/10/2006 | A | PASS |
Dixie Fellows
|
|
|
r/i and 20lb test to bbq ok
|
Application received | | | 6/28/2006 | | DONE |
|
|
|
This permit was created on the web by Rachael Ingham
|