Third Notice MEC | 2/5/2007 | 2/5/2007 | 2/6/2007 | | DONE |
|
|
|
This permit finaled on the web by ADAM WARR
|
Second Notice MEC | 10/26/2006 | 10/26/2006 | 2/5/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 9/22/2006 | 9/22/2006 | 10/26/2006 | | DONE |
Dixie Fellows
|
|
|
|
Final | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PASS |
Dixie Fellows
|
|
|
Job Contact Chris Buss phone####-####; Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
Pressure Test | 9/21/2006 | 9/21/2006 | 9/21/2006 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/21/2006 at 6:56:52 AM. Contact: ###-####...out of time..called g/c to have you reschedule for fri am
|
Final | 9/20/2006 | 9/20/2006 | 9/20/2006 | A | FAIL |
Dixie Fellows
|
|
|
need to test all gas lines to rtu's from main to units (remove regs first). regs are not installed per manuf. they need to be upside down (keep clearance away from possible snow on roof) with vent limiters removed per manuf
|
Final | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PART |
Dixie Fellows
|
|
|
JOB CONTACT: CHRIS BUSS ###-####; Phone #: ###-#### Internet Inspection Request from: JENN STALEY..no gas test required as stub outs to equipment were installed on shell and core. i will check the gas flex connections and regs on building final
|
Application received | | | 8/15/2006 | | DONE |
|
|
|
This permit was created on the web by JENN STALEY
|