VOIDED CHANGE STATUS | | | 10/17/2006 | | DONE |
|
|
|
per Dixie did not need permit
|
Final | 8/29/2006 | 8/29/2006 | 8/29/2006 | P | DONE |
Dixie Fellows
|
|
|
this permit needs to be refunded..no test required..dixie
|
Pressure Test | 8/28/2006 | 8/29/2006 | 8/29/2006 | A | CANC |
Dixie Fellows
|
|
|
###-####..no inspection required..called rita to issue a refund for permit..dixie
|
Final | 8/25/2006 | 8/28/2006 | 8/28/2006 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/25/2006 at 1:13:05 PM. Contact: ###-####...not ready for a final..i rescheduled this for tues am
|
Application received | | | 8/25/2006 | | |
|
|
|
|
Issue permit | | | 8/25/2006 | | DONE |
|
|
|
|