Third Notice MEC | 3/2/2007 | 3/2/2007 | 3/5/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice MEC | 2/5/2007 | 2/5/2007 | 3/2/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 1/4/2007 | 1/4/2007 | 2/5/2007 | | DONE |
Alan Hauser
|
|
|
|
Final | 1/3/2007 | 1/4/2007 | 1/4/2007 | A | PASS |
Alan Hauser
|
|
|
missing t/p drain line, this is covered by plumbing inspector
|
Final | 12/27/2006 | 12/28/2006 | 12/29/2006 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/27/2006 at 1:43:50 PM. Contact: ###-####....called jason to meet me at the job..he was unable to meet me thurs or fri and chose to wait for alan to return..i called the g/c and let him know what was going on..thanks dixie
|
Rough-in | 11/13/2006 | 11/13/2006 | 11/14/2006 | P | PASS |
Alan Hauser
|
|
|
4-20#
|
Rough-in | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | FAIL |
Alan Hauser
|
|
|
2nd flr south unit dryer vent has been pushed out of wall cavity by foam, and need 1" clearance from b-vent to roof sheathing
|
Pressure Test | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Alan Hauser
|
|
|
4-20#
|
Application received | | | 9/19/2006 | | |
|
|
|
|
Issue permit | | | 9/19/2006 | | DONE |
|
|
|
|