Final | 10/5/2006 | 10/6/2006 | 10/6/2006 | P | PASS |
Alan Hauser
|
|
|
clerks have been e-mailed to add pressure test to permit
|
Reinspection Fee (no hold) | 10/6/2006 | 10/6/2006 | 10/6/2006 | P | PASS |
Alan Hauser
|
|
|
doing work with out permit, gas piping
|
Pressure Test | 10/5/2006 | 10/6/2006 | 10/6/2006 | A | PASS |
Troy James
|
|
|
This is an oil to gas change out. We need the gas line passed off so customer can get a meter set before the weekend. I’ll have to have the final later in the p.m. as late as possible. Our installers will be on sight. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt 20# test
|
Final | 10/5/2006 | 10/6/2006 | 10/5/2006 | A | CANC |
Dixie Fellows
|
|
|
This is an oil to gas change out. We need the gas line passed off so customer can get a meter set before the weekend. I'll have to have the final later in the p.m. as late as possible. Our installers will be on sight. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|
Application received | | | 10/5/2006 | | DONE |
|
|
|
This permit was created on the web by Aaron Alandt
|