Second Notice MEC | 2/5/2007 | 2/5/2007 | 2/6/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 1/9/2007 | 1/9/2007 | 2/5/2007 | | DONE |
Troy James
|
|
|
|
Final | 1/8/2007 | 1/9/2007 | 1/9/2007 | P | PASS |
Troy James
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Rough-in | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | PART |
Dixie Fellows
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..checked all welds on both hoods and grease duct..non-combustible wall behind the hood..they cut the insulation on the side wall so they would have their 18" clearance to combustible. no need for fire-wrap as all the clearances to the grease duct were met. the make-up air is coming from the warehouse and this is per the engineer due to the size of the building..ok to cover..dixie
|
Application received | | | 11/13/2006 | | |
|
|
|
|
Issue permit | | | 11/13/2006 | | DONE |
|
|
|
|