Final | 3/16/2007 | 3/16/2007 | 3/16/2007 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-####
|
Rough-in | 1/12/2007 | 1/16/2007 | 1/16/2007 | A | PASS |
Dixie Fellows
|
|
|
Corrections taken care of. Thanks, April. Phone #: ###-####
|
Pressure Test | 1/10/2007 | 1/11/2007 | 1/11/2007 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-####..a-1 plumbing did the gas and tests on this job..talked to april..dixie
|
Rough-in | 1/10/2007 | 1/11/2007 | 1/11/2007 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-####...ok to cover..need light and disconnect for furn in crawl..need 1" clearance from b-vent to flex..strap horiz length of b-vent in crawl
|
Application received | | | 1/10/2007 | | DONE |
|
|
|
This permit was created on the web by Rachael Ingham
|