Final | 5/21/2007 | 5/22/2007 | 5/22/2007 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/21/2007 at 2:30:14 PM.Note: please call for door code Contact: ###-####....electric range installed at final
|
Final | 5/17/2007 | 5/18/2007 | 5/18/2007 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/17/2007 at 12:33:45 PM. Contact: ###-####...need clearance from cook-top to overhead combustibles..location of secondary drain for upstairs furnace..condensate from garage furnace is sloped back into house
|
Rough-in | 3/9/2007 | 3/12/2007 | 3/12/2007 | A | PASS |
Dixie Fellows
|
|
|
nick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..corrections made..thanks
|
Pressure Test | 3/9/2007 | 3/9/2007 | 3/9/2007 | P | PART |
Alan Hauser
|
|
|
20# test, ok to cover, on final need to check attic furnace flue is all b-vent
|
Pressure Test | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 10:12:58 AM. Contact: ###-####....bad guage...please have your builder watch his clearance around the gas range..thanks dixie
|
Rough-in | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 10:12:43 AM. Contact: ###-####....attic access not per irc
|
Issue permit | | | 2/12/2007 | | DONE |
|
|
|
|
Application received | | | 2/12/2007 | | |
|
|
|
|