Third Notice MEC | 9/13/2007 | 9/13/2007 | 12/3/2007 | | DONE |
|
|
|
This permit finaled on the web by Sonja Hankel
|
Second Notice MEC | 8/7/2007 | 8/7/2007 | 9/13/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/17/2007 | 7/17/2007 | 8/7/2007 | | DONE |
Alan Hauser
|
|
|
|
Final | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PASS |
Alan Hauser
|
|
|
|
Final | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PART |
Dixie Fellows
|
|
|
Please call Shane before you head over to the jobsite for areas to be inspected. Thank you ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel...gas, hydronics for 2nd floor ok...the g/c wanted me to sign off on the shell/core. i told him tht permit wasn't called in and i didn't know if ymc's permit was finaled. the boiler on roof is ok for final on plumbing side only..dixie
|
Rough-in | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PASS |
Dixie Fellows
|
|
|
Please call Shane before you head over to the jobsite for areas to be inspected. Thank you ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
MEC-Aging Inspection | 6/21/2007 | 6/21/2007 | 6/21/2007 | | CANC |
Alan Hauser
|
|
|
|
Pressure Test | 4/13/2007 | 4/16/2007 | 4/16/2007 | A | PART |
Alan Hauser
|
|
|
1st and 2nd floor hydronic test ok, all gas piping tested, 60#
|
Application received | | | 4/13/2007 | | DONE |
|
|
|
This permit was created on the web by Sonja Hankel
|