Second Notice MEC | 4/29/2008 | 4/29/2008 | 5/2/2008 | | DONE |
Tisha Gallop
|
|
|
First Notice has not been responded to.
|
First Notice | 4/15/2008 | 4/15/2008 | 4/29/2008 | | DONE |
Dixie Fellows
|
|
|
|
Final | 4/15/2008 | 4/15/2008 | 4/15/2008 | P | PASS |
Dixie Fellows
|
|
|
###-#### Ivan
|
Final | 3/20/2008 | 3/21/2008 | 3/21/2008 | A | PART |
Dixie Fellows
|
|
|
Dixie this is a request from PETRA for an inspection on cabinets and cook tops. They have requested that I be onsite to met with you. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...temp occ on units 103,104,105,205,403,404,405 only at this time..dixie
|
(F) Reprint permit | | | 3/12/2008 | | |
|
|
|
|
Conference | 3/4/2008 | 3/5/2008 | 3/7/2008 | A | PASS |
Dixie Fellows
|
|
|
jack ###-####...met with jack to discuss overhead combustible cabinets at cook-tops..i then called him thurs pm and told him to contact the engineer on the job.
|
Conference | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PEND |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/3/2008 at 3:49:23 PM. Contact: ###-####....called manuf...waiting for return call
|
Final | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | NR |
Dixie Fellows
|
|
|
Alternate phone ###-#### Final inspection, first floor, re-inspection on roof and all items relevant to Total Comfort Hvac. Phone #: ###-#### Internet ..Inspection Request from: Thomas Harrison....waiting for cabinet clearance to gas cook-tops to be resolved
|
Conference | 2/21/2008 | 2/22/2008 | 2/22/2008 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/21/2008 at 3:20:49 PM. Contact: ###-####....met with jack to discuss clearances above counter to overhead cabinets
|
Final | 2/19/2008 | 2/20/2008 | 2/21/2008 | A | FAIL |
Dixie Fellows
|
|
|
Final inspection for floors 2,3,4,5 all units and Roof. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...posted corrections for floors 2-5 and the roof with jack and contractor
|
CHANGE STATUS TO (ISS) | | | 1/25/2008 | | |
|
|
|
change back to issued--paid fees
|
CHANGE STATUS TO (COL) | | | 1/18/2008 | | DONE |
|
|
|
|
Rough-in | 10/31/2007 | 11/1/2007 | 11/1/2007 | A | PASS |
Bill VanDegrift
|
|
|
Rough in inspection 5th floor. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison 5th floor ri ok
|
Rough-in | 10/19/2007 | 10/22/2007 | 10/22/2007 | A | PART |
Dixie Fellows
|
|
|
Ivan, will be on site please call ###-####. Re-inspection for units 105,205,305 added dryer booster fan. Also rough in inspection for all units fourth floor. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...ok for for cover in all areas listed in request
|
Rough-in | 10/8/2007 | 10/9/2007 | 10/9/2007 | A | FAIL |
Dixie Fellows
|
|
|
Reinspect dryer vent rooms 105,205,305
Lee ###-#### Ivan ###-#### Tom ###-#### Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...will need booster fans in above units
|
Rough-in | 10/1/2007 | 10/2/2007 | 10/2/2007 | A | PART |
Dixie Fellows
|
|
|
call Tom at ###-#### or Ivan at ###-#### when headed to project so we can meet the inspector at the site. Inspection is for 1,2, and 3 floor unit cover inspection. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison....partial cover except in rooms 105-205-207 dryer vents exceed allowable length
|
Rough-in | 9/28/2007 | 10/1/2007 | 10/1/2007 | A | FAIL |
Dixie Fellows
|
|
|
cover inspection for first, second and third floor, all units. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison..called tom-no return call...went to job site called (jack)...he called the journeyman on site to meet me..i waited 10 minutes and nobody showed up
|
Rough-in | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | PART |
Dixie Fellows
|
|
|
1/2/3 cover mechanical rooms. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...ok to cover lids in mechanical rooms 1-2-3 floors
|
Rough-in | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | PART |
Dixie Fellows
|
|
|
General contractor is requesting cover inspections for mechanical rooms that are completed on first, second and third floors, one unit on each floor is not ready, waiting on engineering. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...ok to cover closet lids on units signed off on plans
|
Conference | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | PASS |
Dixie Fellows
|
|
|
meet with tom and dave at 9:00....reviewed plans and discussed fire penetrations, dampers, dryer vents, bath exhaust, etc....need stamped signed document from engineer on all changes
|
Conference | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | PEND |
Dixie Fellows
|
|
|
We would like to review this project with the mechanical and structural inspectors. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison....rescheduled so we could meet with dave hanah
|
Application received | | | 9/4/2007 | | DONE |
|
|
|
This permit was created on the web by Thomas Harrison
|