Final | 6/23/2009 | 6/24/2009 | 6/24/2009 | A | PASS |
Troy James
|
|
|
scott Phone #: ###-####
|
Conference | 6/18/2009 | 6/18/2009 | 6/18/2009 | P | DONE |
Troy James
|
|
|
left message for owner to call me for final inspection
|
Final | 1/20/2009 | 1/22/2009 | 1/22/2009 | A | FAIL |
Troy James
|
|
|
scott Phone #: ###-#### exposed metal duct needs to be insulated in garage and need 90 fitting to air intake
|
Rough-in | 3/4/2008 | 3/5/2008 | 3/5/2008 | P | PASS |
Bill VanDegrift
|
|
|
scott Phone #: ###-#### ri, 20# test ok
|
Rough-in | 2/29/2008 | 3/4/2008 | 3/4/2008 | A | FAIL |
Bill VanDegrift
|
|
|
Thersa Phone #: ###-#### seal return at furnace/filter joint. !" clearance required at b-vent roof penetration. test new gas line in the garage ceiling. repair leak in furnace exhaust.(horizontal to vertical up 90). water heater flue termination too low.
|
Application received | | | 2/29/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/29/2008 | | DONE |
|
|
|
|