First Notice | 3/20/2009 | 3/20/2009 | 7/23/2009 | | DONE |
Alan Hauser
|
|
|
This permit finaled on the web by Brian Donahue
|
Final | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Alan Hauser
|
|
|
|
Final | 3/18/2009 | 3/19/2009 | 3/19/2009 | P | PART |
Alan Hauser
|
|
|
all equipment on roof ok
|
Rough-in | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PART |
Dixie Fellows
|
|
|
joe ###-####-- /2nd floor r/i and final ok...1st floor r/i ok except for storage area..roof n/r
|
Conference | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PASS |
Dixie Fellows
|
|
|
Matt- call 1 hr prior to going Phone #: ###-####--should be a r/i
|
Override - Parcel Holds | 3/16/2009 | 1/1/1900 | 3/16/2009 | | |
|
|
|
MEC insp for Alan
|
Rough-in | 3/12/2009 | 3/13/2009 | 3/13/2009 | A | FAIL |
Alan Hauser
|
|
|
work was covered on 2nd floor before inspection
|
Reinspection Fee (no hold) | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Alan Hauser
|
|
|
no inspections on 2nd floor before work was covered
|
Rough-in | 1/20/2009 | 1/21/2009 | 1/21/2009 | P | PART |
Alan Hauser
|
|
|
2nd floor bathroom lids ok for cover and two shafts to 1st floor
|
Application received | | | 1/20/2009 | | DONE |
|
|
|
This permit was created on the web by Brian Donahue
|