Final | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | PASS |
Troy James
|
|
|
|
Final | 3/13/2009 | 3/16/2009 | 3/16/2009 | P | FAIL |
Troy James
|
|
|
Please inspect as close to 4:00pm as possible. Call with any problems. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims all hydronic piping required to be completed before final can be completed, need metal strap for support to flue and air intake, see manual for correct flue and intake termination to exterior, pressure relief valves and condensate drain are not completed at this time
|
Pressure Test | 3/13/2009 | 3/16/2009 | 3/16/2009 | P | PASS |
Troy James
|
|
|
Please inspect as close to 4:00pm as possible. Call with any problems. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims 20# test
|
Application received | | | 3/11/2009 | | DONE |
|
|
|
This permit was created on the web by April Sims
|