Permit Information
Permit NumberMEC09-02182
StatusFinaled
Name ADVANCED HEATING & COOLING
Site Address 6898 S SUPPLY WAY Unit: 300
Project NameTrinity Trailer Manufacturing
Customer Number 
ePlanReview 
Description
Mechanical Permit - Alteration: new furnace, a/c & coil run new gas piping
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice2/18/20102/18/201012/4/2012 DONE
DetailsTroy James
This permit finaled on the web by Angie maguire
Final2/18/20102/18/20102/18/2010PPASS
DetailsTroy James
Please complete final after 2:00 pm today. Please call Eric prior to inspection.
Thanks. Inspection requested from web by: Kim Frans Phone #: ###-####
Rough-in2/17/20102/17/20102/17/2010APASS
DetailsTroy James
Pressure Test2/16/20102/16/20102/17/2010PPASS
DetailsTroy James
complete a gas pressure test AGAIN. Bill VanDegrift was out on 9/21/09 and completed a gas pressure test but did not record as there were other issues with building permit etc... So please complete another gas pressure test Inspection requested from web by: Alana Lane Phone #: ###-####
Final2/15/20102/16/20102/16/2010AFAIL
DetailsTroy James
Please complete final inspection.
Thank you. Inspection requested from web by: Kim Frans Phone #: ###-####
still need gas test and remove gas flex connector inside of furnace and attach permit to building permit
MEC-Aging Inspection2/3/20102/3/20102/4/2010 PEND
DetailsTroy James
Final12/2/200912/3/200912/3/2009AFAIL
DetailsTroy James
please complete a rough in, pressure test & final is possible. Call Eric with any questions ###-####, call Cameron ###-#### for building access. Phone #: ###-#### Internet Inspection Request from: Alana Lane
need test to gas line, gas flex connector cannot be in furnace housing and need fresh air to furnace
MEC-Aging Inspection11/23/200911/23/200911/23/2009 PEND
DetailsTroy James
Pressure Test9/21/20099/21/20099/21/2009PFAIL
DetailsBill VanDegrift
please complete rough-in & pressure test. Electrical will be completed later this week Phone #: ###-#### Internet Inspection Request from: Alana Lane work requireing a building permit has been done at this address. contact boise city PDS- ###-####- for permit requirements commercial plan reviewer. plumbing has been installed without a permit or inspection, secure a licensed contractor and have him permit and call for a conference prior to any additional work. mechanical ri incomplete, no inspection, pending building permit... this is stop work.
Application received  9/16/2009 DONE
This permit was created on the web by Alana Lane