Final | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Bill VanDegrift
|
|
|
John Phone #: ###-####
|
Rough-in | 9/29/2009 | 9/30/2009 | 9/30/2009 | A | PART |
Dixie Fellows
|
|
|
Talked with Dixie about meeting me at the job at 11:00 on Wednesday Phone #: ###-#### Internet Inspection Request from: steve canfield...ok to cover basement and 2nd floor...need to check elec furnace in attic and termination for range....gas ok..20lb
|
Rough-in | 9/28/2009 | 9/29/2009 | 9/29/2009 | A | FAIL |
Dixie Fellows
|
|
|
steve Phone #: ###-####...there is wires and plumbing vents in r/a plenums..range vent termination not per code, etc..need gas test at f/p
|
Rough-in | 9/17/2009 | 9/18/2009 | 9/18/2009 | P | PART |
Alan Hauser
|
|
|
3rd floor not ready, need combustion air to equipment room, check on final, should be able to get from garage and 20# test for whole system except future fire place
|
Application received | | | 9/17/2009 | | |
|
|
|
|
Issue permit | | | 9/17/2009 | | DONE |
|
|
|
|