First Notice | 4/30/2010 | 4/30/2010 | 8/9/2010 | | DONE |
Troy James
|
|
|
This permit finaled on the web by Brandon Sorensen
|
DOC - Permit Finaled | 4/30/2010 | 4/30/2010 | 4/30/2010 | P | PASS |
Troy James
|
|
|
|
Final | 4/23/2010 | 4/23/2010 | 4/23/2010 | P | PART |
Troy James
|
|
|
passed chemical room, waiting for mechanical permit from ammonia contractor before signing off this permit
|
Rough-in | 3/24/2010 | 3/24/2010 | 3/24/2010 | A | PASS |
Troy James
|
|
|
inspected fire dampers by the sip room
|
Rough-in | 3/11/2010 | 3/11/2010 | 3/11/2010 | A | PASS |
Troy James
|
|
|
ok fsd framing
|
Rough-in | 3/8/2010 | 3/9/2010 | 3/9/2010 | A | PASS |
Troy James
|
|
|
bath fans and transfer air duct ok, package units ok to offices
|
Rough-in | 2/23/2010 | 2/24/2010 | 2/24/2010 | A | PASS |
Troy James
|
|
|
inspected ducts above ceiling
|
Conference | 1/12/2010 | 1/12/2010 | 1/12/2010 | A | DONE |
Troy James
|
|
|
met with Luke on site, walked job site
|
Application received | | | 1/12/2010 | | DONE |
|
|
|
This permit was created on the web by Brandon Sorensen
|