First Notice | 2/4/2010 | 2/4/2010 | 4/7/2010 | | DONE |
Alan Hauser
|
|
|
|
Final | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 2/3/2010 | 2/4/2010 | 2/4/2010 | A | PASS |
Alan Hauser
|
|
|
20# and 60#
|
Pressure Test | 1/16/2010 | 1/19/2010 | 1/19/2010 | A | PART |
Alan Hauser
|
|
|
20# test on pipe in wall down to water heater, still need soap test on piping in attic at equipment. pipe from meter to area in this space for equipment in attic was tested on shell/core
|
Rough-in | 1/16/2010 | 1/19/2010 | 1/19/2010 | A | PASS |
Alan Hauser
|
|
|
duct in attic ready, look at hook up and equipment and pt on main line at final or after sheetrock
|
Application received | | | 1/13/2010 | | DONE |
|
|
|