Final | 9/17/2010 | 9/17/2010 | 9/17/2010 | P | PASS |
Troy James
|
|
|
Oleg Phone #: ###-####
|
Final | 9/15/2010 | 9/15/2010 | 9/15/2010 | P | FAIL |
Dixie Fellows
|
|
|
Ollie Phone #: ###-####..furn comb air and flue terminations not per manuf...i circled it in the manuf specs book and left it by the furnace
|
Rough-in | 7/14/2010 | 7/14/2010 | 7/14/2010 | P | PASS |
Dixie Fellows
|
|
|
OLEG
|
Rough-in | 7/14/2010 | 7/14/2010 | 7/14/2010 | P | PASS |
Dixie Fellows
|
|
|
is this ok now? request by 415
|
Rough-in | 7/13/2010 | 7/13/2010 | 7/13/2010 | P | FAIL |
Dixie Fellows
|
|
|
Rough in and pressure test please Ollie Phone #: ###-####...comb air intake to be in same pressure zone as exhaust
|
Override - Parcel Holds | 7/13/2010 | 1/1/1900 | 7/13/2010 | | |
|
|
|
not inspecting framing
|
Rough-in | 7/9/2010 | 7/12/2010 | 7/12/2010 | A | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...need to install tankless w/h...comb air for furnace
|
Override - Parcel Holds | 7/9/2010 | 1/1/1900 | 7/9/2010 | | |
|
|
|
mec rough in
|
Application received | | | 7/9/2010 | | |
|
|
|
|
Issue permit | | | 7/9/2010 | | DONE |
|
|
|
|