Final | 11/8/2010 | 11/9/2010 | 11/9/2010 | A | PASS |
Dixie Fellows
|
|
|
Oleg Phone #: ###-####
|
Final | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | FAIL |
Dixie Fellows
|
|
|
need 6"clearance from single wall to combustible
|
Final | 11/5/2010 | 11/5/2010 | 11/5/2010 | P | FAIL |
Dixie Fellows
|
|
|
Ollie Phone #: ###-####..DISCUSSED C/N WITH OLEG
|
Final | 11/5/2010 | 11/5/2010 | 11/5/2010 | A | FAIL |
Dixie Fellows
|
|
|
oleg..need specs
|
Conference | 11/5/2010 | 11/5/2010 | 11/5/2010 | A | FAIL |
Bill VanDegrift
|
|
|
meet dixie at 9:15 need water heater manual
|
Final | 11/4/2010 | 11/4/2010 | 11/4/2010 | P | FAIL |
Dixie Fellows
|
|
|
call if need access info//Oleg Phone #: ###-####...i need to call the manuf for the equipment and talk to them..please have the door to the garage unlocked by 9:00..thanks
|
Final | 9/30/2010 | 10/1/2010 | 10/1/2010 | A | NR |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...ok to install range vent
|
Pressure Test | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | PASS |
Dixie Fellows
|
|
|
Olllie-Pressure test and rough in inspection please Phone #: ###-####...R/I AND 20LB GAS OK
|
Pressure Test | 7/26/2010 | 7/26/2010 | 7/26/2010 | P | FAIL |
Alan Hauser
|
|
|
there is no permit for gas piping, exhaust fans. recall when permit is updated
|
Reinspection Fee (no hold) | 7/26/2010 | 7/26/2010 | 7/26/2010 | P | PASS |
Alan Hauser
|
|
|
Ollie-rough in- and pressure test inspection please Phone #: ###-#### permit all work done, then call for reinspection
|
Override - Parcel Holds | 7/26/2010 | 1/1/1900 | 7/26/2010 | | |
|
|
|
not scheduling framing inspection
|
Rough-in | 7/9/2010 | 7/12/2010 | 7/12/2010 | A | FAIL |
Dixie Fellows
|
|
|
oleg Phone #: ###-####..vent furn and bath exhaust..range vent? gas failed-leak...install tankless w/h
|
Override - Parcel Holds | 7/9/2010 | 1/1/1900 | 7/9/2010 | | |
|
|
|
mec rough in
|
Application received | | | 7/9/2010 | | |
|
|
|
|
Issue permit | | | 7/9/2010 | | DONE |
|
|
|
|