Final | 1/27/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Dixie Fellows
|
|
|
oleg Phone #: ###-####
|
Final | 1/26/2011 | 1/27/2011 | 1/27/2011 | A | FAIL |
Alan Hauser
|
|
|
finish refrig. lines
|
Pressure Test | 11/30/2010 | 12/1/2010 | 12/1/2010 | A | PASS |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...r/i and 20lb gas ok
|
Rough-in | 11/29/2010 | 11/29/2010 | 11/29/2010 | P | PART |
Dixie Fellows
|
|
|
oleg Phone #: ###-####...gas ok...protect pvc flue at 2nd floor...need 1/4" slope on pvc at 2nd floor
|
Application received | | | 11/29/2010 | | |
|
|
|
|
Issue permit | | | 11/29/2010 | | DONE |
|
|
|
|