Final | 7/25/2012 | 7/26/2012 | 7/26/2012 | A | PASS |
Bill VanDegrift
|
|
|
please do final any questions contact Jason Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|
Rough-in | 7/25/2012 | 7/26/2012 | 7/25/2012 | A | CANC |
Dixie Fellows
|
|
|
please do rough in any questions contact Jason Phone #: ###-#### >> Inspection requested via web by Diane Myslivy Inspection cancelled from web by: Diane Myslivy
|
Conference | 6/29/2012 | 7/2/2012 | 7/2/2012 | A | PASS |
Dixie Fellows
|
|
|
call darrin about job ###-####...waiting on cabinets so they can finish the exhaust on the range
|
Mec-Aging Inspection | 6/28/2012 | 6/28/2012 | 6/29/2012 | | PEND |
Dixie Fellows
|
|
|
will call darrin about this job
|
Conference | 3/29/2012 | 3/29/2012 | 3/29/2012 | P | PASS |
Dixie Fellows
|
|
|
with Darin Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|
Mec-Aging Inspection | 3/27/2012 | 3/27/2012 | 3/28/2012 | | PASS |
Dixie Fellows
|
|
|
talked to owner...work in progress
|
Pressure Test | 12/27/2011 | 12/28/2011 | 12/28/2011 | A | PASS |
Dixie Fellows
|
|
|
please do the pressure witness on the wall heater in the garage to generator. Call Darin Phone #: ###-#### >> Inspection requested via web by Diane Myslivy..60lb u/g to generator ok...60lb main from meter to drops ok...regs not installed yet
|
Rough-in | 12/13/2011 | 12/14/2011 | 12/14/2011 | A | PASS |
Alan Hauser
|
|
|
WHOLE HOUSE OK FOR COVER, EXCEPT BOILER/WATER HEATER ROOM. WAS TOLD THIS WOULD BE LEFT OPEN. WILL NEED COMBUSTION AIR
|
Rough-in | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | NR |
Dixie Fellows
|
|
|
9:00 meet contractor..met darin to discuss what was to be done before a r/i was called in
|
Rough-in | 10/5/2011 | 10/6/2011 | 10/6/2011 | A | PEND |
Dixie Fellows
|
|
|
please do the rough in inspection, job is taken longer then expected. Darin is the contact Phone #: ###-#### >> Inspection requested via web by Diane Myslivy....rescheduled for fri am...darrin unable to meet me today
|
Mec-Aging Inspection | 8/4/2011 | 8/4/2011 | 8/9/2011 | | PASS |
Dixie Fellows
|
|
|
WIP
|
Pressure Test | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | PART |
Dixie Fellows
|
|
|
Meet Darin or Jason there for pressure and pre rough in. Darin ###-#### or Jason Phone #: ###-#### >> Inspection requested via web by Diane Myslivy... 60lb test from meter to above w/h behind the kitchen ok..20lb test at w/h ok...20lb test at w/h behind bedroom ok....part of r/i ok...waiting on 2 bath exhausts and 4 f/p
|
Pressure Test | 4/18/2011 | 4/19/2011 | 4/19/2011 | A | PEND |
Dixie Fellows
|
|
|
please do pressure test and pre rough in this is a geo therm job. Contact is Darin Phone #: ###-#### >> Inspection requested via web by Diane Myslivy...i need the installer to meet me at the job
|
Application received | | | 4/18/2011 | | DONE |
|
|
|
This permit was created on the web by Diane Myslivy
|