Final | 8/5/2011 | 8/5/2011 | 8/5/2011 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 8/4/2011 | 8/5/2011 | 8/5/2011 | A | DONE |
Alan Hauser
|
|
|
|
Final | 8/2/2011 | 8/3/2011 | 8/3/2011 | A | NR |
Alan Hauser
|
|
|
|
Final | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | NR |
Alan Hauser
|
|
|
|
Final | 7/27/2011 | 7/28/2011 | 7/28/2011 | A | FAIL |
Alan Hauser
|
|
|
no duct blaster test report no air balance report
|
Final | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | CANC |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
Pressure Test | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Jim Johnson
|
|
|
20# pressure test ok
|
Rough-in | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Jim Johnson
|
|
|
hvac as per wrightsoft,no duct blaster test yet,look for this on final
|
Rough-in | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | FAIL |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich need to have Boise City stamped approved set of manual J report on site for rough-in inspection
|
Rough-in | 5/20/2011 | 5/20/2011 | 5/20/2011 | P | NR |
Dixie Fellows
|
|
|
>> Inspection requested via web by Dustin Rich...need all pages of manual J on site at time of r/i
|
Rough-in | 5/19/2011 | 5/20/2011 | 5/20/2011 | A | FAIL |
Troy James
|
|
|
Rough in and pressure test Phone #: ###-#### >> Inspection requested via web by Dustin Rich no manual j
|
Application received | | | 4/27/2011 | | DONE |
|
|
|
This permit was created on the web by Dustin Rich
|