Final | 6/20/2011 | 6/21/2011 | 6/21/2011 | A | PASS |
Eric Strole
|
|
|
|
Final | 6/20/2011 | 6/20/2011 | 6/20/2011 | P | FAIL |
Eric Strole
|
|
|
no balance report on site
|
Final | 6/17/2011 | 6/20/2011 | 6/20/2011 | A | FAIL |
Alan Hauser
|
|
|
air balance report incomplete, no design figures on report
|
Reinspection Fee (no hold) | 6/20/2011 | 6/20/2011 | 6/20/2011 | P | PASS |
Alan Hauser
|
|
|
pick up balance report
|
Final | 6/17/2011 | 6/17/2011 | 6/17/2011 | P | CANC |
Bill VanDegrift
|
|
|
|
Final | 6/17/2011 | 6/17/2011 | 6/17/2011 | P | FAIL |
Bill VanDegrift
|
|
|
oleg Phone #: ###-#### provide air balance report
|
Rough-in | 5/13/2011 | 5/13/2011 | 5/13/2011 | P | PASS |
Troy James
|
|
|
oleg Phone #: ###-#### b-vent clearance ok
|
Rough-in | 5/12/2011 | 5/13/2011 | 5/13/2011 | A | CANC |
Bill VanDegrift
|
|
|
oleg Phone #: ###-#### dix done
|
Rough-in | 5/11/2011 | 5/12/2011 | 5/12/2011 | P | PASS |
Dixie Fellows
|
|
|
Joseph Phone #: ###-####. I witnessed the duct blaster test and report is on the electrical panel..
|
Rough-in | 5/10/2011 | 5/11/2011 | 5/11/2011 | A | PART |
Dixie Fellows
|
|
|
r/i and p/t--Oleg ###-####...r/i and 20lb gas ok...will reschedule for thurs pm for the duct blaster
|
Application received | | | 5/10/2011 | | |
|
|
|
|
Issue permit | | | 5/10/2011 | | DONE |
|
|
|
|