Final | 7/26/2011 | 7/27/2011 | 7/29/2011 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Conference | 7/21/2011 | 7/22/2011 | 7/22/2011 | A | FAIL |
Bill VanDegrift
|
|
|
meet at 9:00am air balance with Les
|
Final | 7/20/2011 | 7/21/2011 | 7/22/2011 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino air balance report is incorrect, need to be onsite when air balance report is being redone for this house, coil is oversized
|
Conference | 7/21/2011 | 7/22/2011 | 7/22/2011 | A | FAIL |
Eric Strole
|
|
|
meet at 9:00am-this was a conferance on the air balance report supplied by TML. The report is not accurate.
|
Rough-in | 5/27/2011 | 5/31/2011 | 5/31/2011 | A | PASS |
Troy James
|
|
|
Brighton Homes will have the Manual J there. Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Pressure Test | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Bill VanDegrift
|
|
|
Building Energy will perform the duct blast test at 12pm today. Phone #: ###-#### >> Inspection requested via web by Debbie Marino 20# TEST ok
|
Rough-in | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PART |
Bill VanDegrift
|
|
|
Building Energy will perform the duct blast test at 12pm today. Phone #: ###-#### >> Inspection requested via web by Debbie Marino duct blaster test ok but there are no approved plans to do an inspection talked to builder they will see that it is called in for an inspection tuesday
|
Application received | | | 5/26/2011 | | DONE |
|
|
|
This permit was created on the web by Debbie Marino
|