Final | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | PASS |
Troy James
|
|
|
Air balance report has been faxed to Troy James on 8/1/11. The Manual J will be onsite. Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Final | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino-need air balance & manual j report on site.
|
Rough-in | 6/13/2011 | 6/13/2011 | 6/13/2011 | P | PASS |
Bill VanDegrift
|
|
|
duct blaster done on 6/8, resubmittals approved ri ok
|
Rough-in | 6/8/2011 | 6/9/2011 | 6/9/2011 | A | CANC |
Bill VanDegrift
|
|
|
Ingo with Building Energy will provide the paperwork and stated that the rough in inspection had passed. Not sure what TML needs to do? Phone #: ###-#### >> Inspection requested via web by Debbie Marino need resubmittals
|
Pressure Test | 6/7/2011 | 6/8/2011 | 6/8/2011 | A | PASS |
Bill VanDegrift
|
|
|
Ingo with/ Building Energy will perform the duct blast test per Bill VanDegrift Phone #: ###-#### >> Inspection requested via web by Debbie Marino 20# test ok
|
Rough-in | 6/7/2011 | 6/8/2011 | 6/8/2011 | A | FAIL |
Bill VanDegrift
|
|
|
10am Ingo bldg. energy ###-#### resubmit ACCA report addressing 5x6 window added in the east side of dinning area 20# test ok
|
Final | 6/7/2011 | 6/8/2011 | 6/7/2011 | A | CANC |
Bill VanDegrift
|
|
|
ingo bld. energy 631 2104 10 am its a r/i
|
Pressure Test | 6/6/2011 | 6/7/2011 | 6/7/2011 | A | NR |
Bill VanDegrift
|
|
|
Building Energy will perform duct blast test @ 9am on 6/7/11. Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 6/6/2011 | 6/7/2011 | 6/7/2011 | A | FAIL |
Bill VanDegrift
|
|
|
Building Energy will perform duct blast test @ 9am on 6/7/11. Phone #: ###-#### >> Inspection requested via web by Debbie Marino buct blaster not on site, no approved plans on site
|
Application received | | | 6/2/2011 | | DONE |
|
|
|
This permit was created on the web by Debbie Marino
|