Final | 8/22/2011 | 8/25/2011 | 8/25/2011 | P | PASS |
Eric Strole
|
|
|
Please call Brian if any corrections ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Rough-in | 7/20/2011 | 7/20/2011 | 7/20/2011 | P | PASS |
Eric Strole
|
|
|
|
Rough-in | 7/18/2011 | 7/19/2011 | 7/20/2011 | P | PART |
Eric Strole
|
|
|
duct blaster test scheduled with Matt ###-#### for 1 pm, please call Brian ###-#### if any corrections needed. Thanks, Andrea. Phone #: ###-#### x0000 >> -Inspection requested via web by Andrea Creek-duct blast test - need to finish framing around b-vent
|
Pressure Test | 7/18/2011 | 7/19/2011 | 7/19/2011 | P | PASS |
Eric Strole
|
|
|
duct blaster test scheduled with Matt ###-#### for 1 pm, please call Brian ###-#### if any corrections needed. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-20 lb test pass
|
Application received | | | 7/18/2011 | | DONE |
|
|
|
This permit was created on the web by Andrea Creek
|