Final | 9/14/2011 | 9/15/2011 | 9/15/2011 | A | PASS |
Troy James
|
|
|
Please call Brian if any problems. ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Rough-in | 8/3/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Eric Strole
|
|
|
Duct blaster test scheduled with Matt ####-#### at 1pm, please call him if you need to change and call Brian ###-#### if any corrections needed. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-duct blast & rough-in pass
|
Pressure Test | 8/3/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Eric Strole
|
|
|
thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-20 lb test pass
|
Application received | | | 8/3/2011 | | DONE |
|
|
|
This permit was created on the web by Andrea Creek
|