Final | 11/16/2011 | 11/17/2011 | 11/17/2011 | A | PASS |
Eric Strole
|
|
|
|
Final | 11/16/2011 | 11/16/2011 | 11/16/2011 | P | FAIL |
Eric Strole
|
|
|
Please complete a final inspection. If there are any questions/issues on site, please contact Eric @ ###-####. (HR 9/14) Phone #: ###-#### >> Inspection requested via web by Jennifer Bryan-no air balance or manual j on site.
|
Rough-in | 8/23/2011 | 8/23/2011 | 8/23/2011 | P | PASS |
Eric Strole
|
|
|
Please complete rough in and pressure test. COntact Eric with any questions. Phone #: ###-#### >> Inspection requested via web by Jillian Andrews-20 lb gas test and rough-in pass.
|
Rough-in | 8/23/2011 | 8/23/2011 | 8/23/2011 | P | CANC |
Eric Strole
|
|
|
|
Rough-in | 8/22/2011 | 8/23/2011 | 8/23/2011 | A | FAIL |
Eric Strole
|
|
|
Please complete rough in and pressure test. Contact Eric with questions. Phone #: ###-#### >> Inspection requested via web by Jillian Andrews-duct blast pass, gas test fail, need a 12"x6" supply register in upstairs bedroom per manual j report.
|
Application received | | | 8/10/2011 | | DONE |
|
|
|
This permit was created on the web by Alana Lane
|