Final | 11/3/2011 | 11/4/2011 | 11/4/2011 | A | PASS |
Eric Strole
|
|
|
Please do the final any questions or concerns contact Jason Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|
Rough-in | 9/13/2011 | 9/14/2011 | 9/14/2011 | P | PASS |
Dixie Fellows
|
|
|
Please do rough in any questions contact Jason Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|
Rough-in | 9/7/2011 | 9/8/2011 | 9/8/2011 | A | FAIL |
Eric Strole
|
|
|
wants 9am -- duct blast ins//Darren Phone #: ###-####-duct blast test pass, equipment and supplys in office do not match manual j report.
|
Rough-in | 9/6/2011 | 9/7/2011 | 9/7/2011 | A | NR |
Eric Strole
|
|
|
10:00 Ductblast rough in and pressure test. Jason ###-#### or Darin are the contacts Phone #: ###-#### >> Inspection requested via web by Diane Myslivy-no manual j or ducy blast at this time.
|
Pressure Test | 9/6/2011 | 9/7/2011 | 9/7/2011 | A | PASS |
Eric Strole
|
|
|
10:00 Ductblast rough in and pressure test. Jason ###-#### or Darin are the contacts Phone #: ###-#### >> Inspection requested via web by Diane Myslivy-20 lb test pass.
|
Application received | | | 8/24/2011 | | DONE |
|
|
|
This permit was created on the web by Diane Myslivy
|