Final | 10/26/2011 | 10/26/2011 | 10/26/2011 | P | PASS |
Dixie Fellows
|
|
|
supply ducts onle
|
Rough-in | 10/26/2011 | 10/26/2011 | 10/26/2011 | P | PASS |
Dixie Fellows
|
|
|
Added 2 zone system and duct work to upstairs addition. Gas line reran and pressure test already inspected. Reran installed flue for water heater and furnace. Phone #: ###-#### >> Inspection requested via web by Russ Curtis
|
Pressure Test | 10/18/2011 | 10/19/2011 | 10/18/2011 | A | CANC |
Eric Strole
|
|
|
Carol Phone #: ###-####
|
Application received | | | 10/18/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/18/2011 | | DONE |
|
|
|
|