Final | 6/5/2012 | 6/5/2012 | 6/5/2012 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino
|
Rough-in | 4/11/2012 | 4/12/2012 | 4/12/2012 | A | PASS |
Eric Strole
|
|
|
8:30 AM DUCT BLAST-duct blast pass
|
Pressure Test | 4/10/2012 | 4/11/2012 | 4/11/2012 | A | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test on 4/11/12 at 9:30am Phone #: ###-#### >> Inspection requested via web by Debbie Marino-20 lb gas test pass.
|
Rough-in | 4/10/2012 | 4/11/2012 | 4/11/2012 | A | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test on 4/11/12 at 9:30am Phone #: ###-#### >> Inspection requested via web by Debbie Marino-rough-in pass. (no show on the 9:30 am duct blast) need to reschedule duct blast.
|
Issue PAID IN FULL permit | | | 4/5/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/4/2012 | | DONE |
|
|
|
This permit was created on the web by Debbie Marino
|