Final | 6/7/2012 | 6/8/2012 | 6/8/2012 | A | PASS |
Eric Strole
|
|
|
Please call Brian at ###-#### of any corrections/questions. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Rough-in | 4/25/2012 | 4/25/2012 | 4/25/2012 | A | PASS |
Eric Strole
|
|
|
differant furnace and upstairs layout. ok per troy james
|
Rough-in | 4/20/2012 | 4/23/2012 | 4/23/2012 | P | FAIL |
Eric Strole
|
|
|
ductblaster test 3pm please with matt ###-####, call brian ###-#### if any corrections please. thanks, andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-duct blast pass. need manual j on site for rough-in.
|
Pressure Test | 4/20/2012 | 4/23/2012 | 4/23/2012 | P | PASS |
Eric Strole
|
|
|
ductblaster test 3pm please with matt ###-####, call brian ###-#### if any corrections please. thanks, andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-20 lb test pass.
|
Issue PAID IN FULL permit | | | 4/20/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/20/2012 | | DONE |
|
|
|
This permit was created on the web by Andrea Creek
|