Final | 8/6/2012 | 8/7/2012 | 8/7/2012 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-####
|
Rough-in | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | PASS |
Dixie Fellows
|
|
|
Harold Phone #: ###-####...need to check gas test and ducting at furnace, both drains off furnace at final
|
Rough-in | 6/28/2012 | 6/28/2012 | 6/29/2012 | P | NR |
Dixie Fellows
|
|
|
harold ###-####...nobody called to let me know they were ready
|
Rough-in | 6/27/2012 | 6/28/2012 | 6/28/2012 | A | NR |
Dixie Fellows
|
|
|
harold Phone #: ###-####...need to seal r/a and install bath exhaust in master bath
|
Application received | | | 5/2/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2012 | | DONE |
Barbara Stitt
|
|
|
|