Final | 5/14/2012 | 5/18/2012 | 5/18/2012 | A | PASS |
Jim Johnson
|
|
|
final and p/t -- Julie ###-#### (5/18/12 @ 7:40 Julie called and said just wants the p/t and she never needed the inspection on the furnace even though they put it on this permit and it was installed a while ago without a permit) 20# pressure test ok
|
Pressure Test | 5/3/2012 | 5/11/2012 | 5/11/2012 | P | CANC |
Alan Hauser
|
|
|
julie ###-#### between 1:45 and 2 pm
|
Pressure Test | 5/2/2012 | 5/2/2012 | 5/3/2012 | P | CANC |
Alan Hauser
|
|
|
Around 1:45 or 2 if possible please--call at ###-#### Julie Gas company will be there at 1:00 to start project
|
Application received | | | 5/2/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2012 | | DONE |
Barbara Stitt
|
|
|
|