Final | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Eric Strole
|
|
|
Final - number is builder (scott) if code is needed
thanks Phone #: ###-#### >> Inspection requested via web by Brian Preece
|
Rough-in | 5/14/2012 | 5/15/2012 | 5/15/2012 | P | PASS |
Eric Strole
|
|
|
second rough in. venting changed out to inspectors / manual specifications. Phone #: ###-#### >> Inspection requested via web by Brian Preece
|
Rough-in | 5/12/2012 | 5/14/2012 | 5/14/2012 | A | FAIL |
Eric Strole
|
|
|
rough in Phone #: ###-#### >> Inspection requested via web by Brian Preece-flex pipe per manufacture cannot be over a 45 degree.
|
Issue PAID IN FULL permit | | | 5/9/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/9/2012 | | DONE |
|
|
|
This permit was created on the web by Brian Preece
|